Billet/Round F-EMS

                                          It is generally installed in the final stage where the molten core is 25%-35% of the width of the billet. The main function is to improve the equiaxed crystal rate of the billet, improve the center porosity and shrinkage , and improve the center segregation and v-shape segregation.

                                           

                                          It is generally installed in the final stage where the molten core is 25%-35% of the width of the billet. The main function is to improve the equiaxed crystal rate of the billet, improve the center porosity and shrinkage , and improve the center segregation and v-shape segregation.

                                          HUNAN KEMEIDA ELECTRIC CO., LTD. All Rights Reserved           湘公網安備43060402000026號        湘ICP備16013601號-1   
                                          国产片婬乱18一级毛片视频|久久精品呦女暗网|人妖在线精品一区二区三区|国产高清一级夜夜爽|日韩亚洲国内综合网